Everything starts at once.
Computing, cooling and production can overlap. When demand exceeds available connection capacity, growth and operating schedules can come into conflict.
GridFlow develops intelligent demand flexibility software to help data centers, industrial facilities and grid operators anticipate electricity demand, reduce peak loads and make better use of existing grid capacity.
A site peak is the highest power it draws. A connection limit is the power available to that site. Network congestion depends on conditions reported by the grid operator.
Computing, cooling and production can overlap. When demand exceeds available connection capacity, growth and operating schedules can come into conflict.
Some electricity use can move in time. Without a clear view of the constraints, that potential stays unexplored.
A lower peak may still miss a temporary limit. Compare load shifting and battery dispatch against the actual limit entered for each interval before pricing the result.
The same energy. A different demand curve. An opportunity to use existing electrical capacity more intelligently.
Peak shaving is the goal. Load shifting and batteries are two ways to achieve it. The demo schedules them using physical constraints; future AI forecasting would help anticipate when flexibility is needed.
We focus on power-intensive facilities and the grid partners that define their operating limits. A pilot tests the value for each site and its connection.
When a power limit constrains growth, test deferrable workloads and battery dispatch to shave grid peaks while protecting critical computing.
When production peaks overlap, test scheduling and storage to reduce peak import and costs while preserving operational continuity.
When local capacity is tight, assess available demand flexibility and test coordinated load or storage schedules for flexible connection scenarios.
Start with one site, an agreed power limit and a question your operations team wants to measure.
Agree on the capacity limit, the loads to study and what a successful pilot would measure.
Use permitted interval data, operating windows and actual tariffs to compare schedules.
Review calculations, remaining exceedance and operational feasibility with qualified engineers and the site team.
After approval, test on a limited scope and measure the outcome against the baseline.
Explore the current models for peak shaving, load shifting and batteries. Forecasting and live coordination are development goals.
Planned AI forecasts would help anticipate high demand from measured site data. No AI forecast is used in the demo.
Estimate the declared load available for shifting after protecting critical use and applying equipment and time limits.
Compare peak shaving from load shifting, battery dispatch or both, against an unchanged reference.
Test a connection limit and temporary import limits supplied or assumed for one connection. Network studies and coordination require separate validation.
Schedule charge and discharge within power, capacity and efficiency limits, with the same charge at the end of the day.
Price the same grid import curves with entered rates, demand charges and costs, whether the result is positive or negative.
Compare load shifting and battery dispatch on one representative day. Test your connection limit and any temporary restrictions before looking at costs.
Only load within these hours can be moved, and only to another allowed interval. No windows means no load shifting.
Enter periods supplied by a grid operator or use explicit scenario assumptions. A site peak is not evidence of congestion. When limits overlap, the lowest applies.
Quarter-hour boundaries, in site-local time. An end earlier than the start runs through midnight.
Final state of charge: 50%, equal to initial charge for a repeatable day. Storage stays within its power and charge limits. Set capacity to zero to test without storage.
A fictional production day with a deferrable process. Production deadlines and critical equipment must be verified on site. Critical demand remains served in every interval. The flexible equipment cap and site grid limit apply to different quantities.
The selected import curve feeds the financial calculation below. No savings percentage is assumed.
Representative day · 15-minute average power (kW)
| Scenario | Peak (kW) | Grid energy (kWh/day) | Time over (min) | Limits met |
|---|---|---|---|---|
| Without Optimization | 429.96 | 5,000 | 180 | No |
| Load Shifting Only | 248.93 | 5,000 | 0 | Yes |
| Battery Optimization Only | 324.15 | 5,026.27 | 0 | Yes |
| Combined Optimization | 238.35 | 5,013.14 | 0 | Yes |
One synthetic day, not live grid data. Check any scenario against measured demand, site constraints and grid operator requirements before changing operations. The threshold check does not approve a connection.
Energy Conservation. Power is an interval average in kW; energy is the sum of those values × 0.25 h in kWh. 1 MW = 1,000 kW and 1 MWh = 1,000 kWh. Load shifting changes timing, so daily site energy is conserved.
Physical Constraint Compliance and Critical Load Protection. The effective limit is the lowest active grid restriction or connection cap. Fixed demand stays at its original time. Flexible load can only move forward within its delay and allowed windows, within equipment power. A transfer or battery dispatch cannot create a new capacity violation or increase the original peak.
Data-Driven Optimization. A flow model allocates flexible energy between allowed intervals. Storage scheduling uses a reachable state-of-charge range. Each step seeks to reduce the largest exceedance first, then the peak, within numerical tolerance. Combined dispatch applies shifting and then storage, without claiming a globally optimal joint schedule.
Battery balance. Stored energy next interval = current stored energy + charging power × charging efficiency × 0.25 h − discharging power × 0.25 h ÷ discharging efficiency. Grid import = site load + charging − discharging. No export or simultaneous charge and discharge. The final charge equals the initial charge, so extra imported energy equals storage losses.
Transparent Financial Assumptions. Energy cost = ∑(grid import in kW × 0.25 h × the applied CHF/kWh tariff) × operating days. Demand cost = the highest billable kW in the month × the monthly CHF/kW rate, applied once. An unchanged peak on other days can limit the benefit. Net savings deduct recurring costs; simple ROI and payback use known upfront costs only.
Independent Technical Validation. Repeating a day misses seasonal peaks and operational variability. The demo does not forecast demand, model network power flow, or validate a dispatch on real equipment. A pilot would use permitted interval data and independent engineering review.
Grid operator economics is a separate future assessment: avoided congestion costs, deferred reinforcement, flexibility service value and participant payments. The calculator below estimates site bill effects only.
Apply your contract rates and implementation costs to the exact reference and selected grid import curves.
The night rate applies outside the day period. Use identical rates for a flat tariff.
Leave unknown upfront costs blank. Enter zero only if that cost is known to be zero. Avoid counting battery wear twice.
Day rate: 07:00–22:00. These are adjustable inputs, not a supplier tariff or GridFlow quote.
Enter known one-time costs to estimate ROI and payback.
One representative day is repeated for the entered operating days; other days’ energy costs are omitted on both sides. Twelve identical months do not capture seasons or exceptional peaks.
See the equations and limits in the simulator methodology. A pilot would test them on permitted site data with independent technical review.
“Load shifting preserves site energy in kWh. Battery losses are accounted for separately from the peak in kW.”
Energy stays accountable“Model the electricity first. Apply the tariff to that same curve. Make every financial assumption visible.”
One scenario, connected calculations“Protect critical operations, respect equipment limits and test schedules against real constraints with qualified professionals before deploying them.”
Operations come firstUnderstand what is modelled today, what needs validation and how to start a pilot.
GridFlow is developing decision support for electricity demand flexibility under limited grid capacity. The current simulator compares load shifting and battery schedules on representative data.
We are seeking pilots to test peak shaving, load shifting and batteries on measured electricity profiles under agreed operating limits.
Your demand profile · Your operating constraints · Your business case